Target cost is plan cost for a specific lot size of production. Target cost is calculated based on quantity of goods are delivered. For example, if a production order has lot size 100 pc. Standard cost estimate is 100 usd/pc. Number of goods delivered is 50 pcs. That target cost displayed on cost object collector is 50*100 = $5000.

Here is a example of Product Cost Collector detailed report.

 

Sometimes, when working with newly configured plant, company code and material, the target cost is not shown. In this case, the following checks should be performed:

  • If there is any goods issue from the material of the product cost collector. Go to tcode CO03 to see how many goods are delivered.

If there is goods received, and target cost doesn’t come on reporting table, check if company code currency is the same as controlling area currency. If not, maintain “Additional cost component splits in controlling area currency” (TCode: OKYW) for current company code and Costing Type, Valuation Variant used in Cost Estimate of the product cost collector. . After that, delete current costing run (t-code: CKR1) and re-update standard price for the material with transaction code CK40N. Material price will be updated with currency of controlling area.

Now you can check target cost again.

Advertisements

Comments on: "While don’t target costs come to product cost collector detailed report" (1)

  1. natarajan.vs said:

    Nice one

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: